DLCC is proud to have worked with AL CARAT on the Riyadh Metro Line 4, 5 & 6 project.
AL CARAT is a Joint Venture between ERSI Group and Attieh Steel Company Limited, which focuses on implementing advanced construction technologies in their projects.
Our scope of work with AL CARAT on this project involved concrete and steel work. We are committed to delivering high-quality work and meeting project timelines while adhering to safety measures.
Our work period with AL CARAT was a valuable experience and we look forward to potential future collaborations.
This project consists of the construction of lines 4 (yellow), 5 (green) and 6 (purple) of the new metro network, which will consist of 25 stations, 64.5 kilometres of metro tracks, 33 kilometres of viaducts, 22 kilometres of underground tracks and 9 kilometres of surface tracks.
ERSI Group has executed 6 underground stations ( 4 of which we worked on ), 2 at ground level, 1 elevated and 3 false tunnels.
In addition, AL-Carat have made the Shop Drawings for 130,000 tonnes of steel, assembly for 80,000 tonnes and the installation of formwork of 160,000 m3 of concrete.
The Riyadh metro will become the largest metro in the world with six lines that will cover 176 kilometres.